Building a Custom Home: Land, Design, Builder and Budget
Building a custom home means designing a house for a specific lot and a specific household, then managing a construction project that often runs a year or more. The decisions come in a fixed order, and a mistake early (the wrong lot, a vague contract, a budget without a contingency) is expensive to fix later. This page walks through the sequence.
Step 1: set the budget and talk to a lender first
Before you look at land, find out what you can borrow and what you are comfortable paying. Building is usually financed differently from buying a finished house:
- Construction loans pay the builder in stages, called draws, as work is completed and inspected. During construction you typically pay interest only, often on the amount drawn so far.
- Construction-to-permanent loans convert to an ordinary mortgage when the house is finished, so there is one application. With separate loans, you take out a new mortgage at the end, at whatever rate and terms are available then.
- Lenders usually review the plans, the builder and the budget before approving, and many want to see a contingency.
Ask each lender how draws are inspected and released, what happens if the build runs late or over budget, whether the permanent rate is fixed at the start or set at conversion, and whether the land can count toward your down payment. Large loans may be jumbo loans with their own rules; see how a mortgage works and try the mansion mortgage calculator for a rough payment.
A worked example budget
The figures below are an example only, to show what a full budget includes. They are not typical costs for land or construction anywhere. Use your own quotes.
| Example budget line | Dollars |
|---|---|
| Land | 120,000 |
| Site work: clearing, driveway, utility connections, well or septic | 30,000 |
| Construction contract | 400,000 |
| Soft costs: design, engineering, surveys, permits, fees | 35,000 |
| Contingency: 10 percent of the construction contract | 40,000 |
| Total | 625,000 |
Also budget for interest during construction, closing costs on the loans, landscaping, window coverings and furniture, and the cost of where you live while the house is built.
Step 2: check the land before you buy it
The lot decides what you can build and what the site work will cost. Make any land purchase contingent on these checks:
- Zoning and rules: permitted use, setbacks, height limits, lot coverage, and any HOA covenants or design review.
- Survey and title: a boundary survey, plus a title search for easements, rights of way and restrictions.
- Utilities: whether water, sewer, power and gas reach the lot, and the cost to connect. Without public sewer, a soil test (often called a perc test) shows whether a septic system is possible and what kind.
- Soil and slope: a geotechnical report on steep, filled or unusual ground, because it affects the foundation design.
- Flood risk: check the FEMA flood map for the lot at the FEMA Flood Map Service Center; it affects where you can build, how high the floor must be and what insurance you need.
- Access: road frontage, driveway permits and access for construction vehicles.
Step 3: the design team
An architect or a residential designer turns your brief into drawings; rules on who may stamp plans vary by state. A structural engineer designs the foundation and framing. Some projects also use an energy consultant, a civil engineer for grading and drainage, or an interior designer. Write a brief first: who will live there, how you use each room, what must be on one level for later life, and your budget. How much house you need helps with sizes, and the room plan can then be priced before the drawings are finished.
Step 4: choose the builder
- Verify the license with your state or local licensing board, and get proof of liability insurance and workers' compensation.
- Visit houses the builder has finished and one under construction, and call past clients.
- Ask who supervises the site day to day and how often you will get updates.
- Get bids from more than one builder on the same drawings and specifications.
Step 5: the contract
The two common structures work differently:
- Fixed price: one price for the defined work. Changes and hidden conditions are extra, and the builder carries the risk of their own estimate.
- Cost-plus: you pay actual costs plus a fee or percentage. More flexible, but the final price is open, so ask for a cap or a detailed estimate and open books.
Either way, the contract should list the drawings and specifications, allowances for finishes you have not chosen, how change orders are priced and approved in writing, the draw schedule tied to completed and inspected stages, the schedule and how delays are handled, who holds the permits, lien waivers from subcontractors and suppliers as payments are made, and the warranty terms. Have a real estate attorney review it before you sign.
Step 6: permits and the build sequence
The building department reviews the plans and inspects the work at set stages. A typical sequence:
- Site preparation and utilities. In the US, the builder or excavator must call 811 a few business days before digging so underground lines are marked.
- Foundation, with inspections before concrete is poured.
- Framing, roof, windows and exterior doors.
- Rough-in of plumbing, electrical, gas and HVAC by licensed trades, then rough inspections.
- Insulation and air sealing.
- Drywall, interior finishes, cabinets and flooring.
- Fixtures, appliances, exterior finishes, grading and driveway.
- Final inspection and the certificate of occupancy (or local equivalent), which you need before moving in.
Visit the site regularly, but only by arrangement with the builder; a construction site has open trenches, ladders and moving equipment. Take photos of the walls before drywall goes up so you know where pipes and wires run.
Step 7: handover
- Do a walkthrough and agree a written punch list before the final payment.
- Collect warranties, manuals, permits, inspection records and the final survey.
- Test smoke alarms on every level and inside and outside sleeping areas, and carbon monoxide alarms on every level and outside sleeping areas if there are fuel-burning appliances or an attached garage.
- Note the dates by which warranty claims must be made, and schedule your own walkthrough before each warranty period ends.
This page explains how building a home generally works and is not financial or legal advice. Before buying land, borrowing or signing a building contract, talk to a lender or HUD-approved housing counselor and a real estate attorney about your own situation.